Sök:

Sökresultat:

1799 Uppsatser om Lead (Pb) - Sida 1 av 120

Ledtidsanalys på Peltor AB med logisk gruppindelning på elektronikprodukter

This report is the result of a case study at Peltor AB during the spring semester of 2007. The task Peltor gave us was to improve the delivery accuracy and to lower the high finical value of delayed orders (backorder), and to divide the products into logical groups. The logical group will be a useful tool to remain a high level of service. If the level of service increases the company will be more competitive.The electronic department at Peltor has problems with delayed orders. According to Peltor, the problem is based on delivery lead time which is presumed.To increase the delivery accuracy, a lead time analysis is made to find the accumulated delivery lead times for each product.

Analys av faktorer som påverkar interna leveransledtider : Dimensionering av lager

It is becoming increasingly important for companies to meet customer demands due to intense competition in today's global market, that forcing companies to improve their offerings and become better at managing their supply chain (Shen et al., 2006).  Long lead times can be reduced by using different methods and strategies shows various researches. Lead times occur in the planning, production, inventories and handling of products (Treville et al., 2003).The aim of the study is to develop a method to analyze the factors that affect the length of internal delivery lead time in manufacturing companies. The method also included suggestions for reducing delivery lead-time to internal customers.The main factors that influenced the length of the on delivery lead times has summarized to make a selection among the factors that can have the most significant impact. The selected elements will be used as a method to analyze how these areas affect a company?s length on internal delivery lead times.The study shows that the causes of the long delivery lead times was the location of the customer order point, uncertain forecasts, long material and production planning time, and long waits in the production and storage.The delivery lead time, according to this report?s suggested improvements reduced by centralizing CODP and makes more reliable forecasts.

Ur led är tiden: En studie av metoder att korta ledtider inom forskning och utveckling

Product development cycles become shorter and shorter. The time from idea to market has become an important competitive factor. Despite this, methods used for making the product development process faster are surrounded with uncertainty about their efficiency. The purpose of the thesis is to describe the pros and cons of ?best practice? methods for shortening lead times and how these methods effect the lead times in research and development.

Snabbast vinner? : en studie om hur e-handelsföretag inom modebranschen arbetar med korta ledtider

PurposeThe purpose of this thesis is to provide a deeper understanding of how e-commercecompanies within the fashion industry are working with lead times and illustrate andanalyse differences and similarities between companies.Research question- In which ways are e-commerce companies within the fashion industry working withshort lead times?MethodologyThis thesis is based on a qualitative research method in order to achieve a greaterunderstanding of the chosen topic, of how the chosen companies are operating and toprovide room to our own interpretations and reflections. Interviews through telephonewere used to gather the empirical data from six different e-commerce companies withinthe fashion industry.ConclusionsAfter completing the theoretical and empirical analysis it can be concluded that leadtimes are considered essential for all of the participating companies but there is adifference in which way they look at, and how they work with lead times. Somecompanies stressed that short lead times are an important aspect of competition andclaimed that this is something they are constantly working with. For others the balanceand matching of supply and demand was the most important factor rather than toachieve short lead times.

Lead user-involvering i produktutvecklingen : en studie om kaffeförvaring

Syftet med uppsatsen är att studera beteende hos lead users angående deras förvaring ochkonsumtion av kaffe. Genom att göra en jämförelse med icke lead users har vi undersöktom lead users uppvisar ett avvikande beteende. Vi har även utifrån svaren kunnat geförslag på lösningar om hur kaffeförvaring kan utformas och förbättras.Utifrån 40 intervjuer med kaffekonsumenter har vi försökt urskilja lead users. Vi harutgått från en modell som vi utvecklat tillsammans och som bygger på tidigare teorier. Vihar poängsatt alla frågor och multiplicerat med viktningsgraden.

Historiska emissioner av bly och arsenik till luft från Åfors Glasbruk och deras konsekvenser för miljön.

Åfors glasswork was a company which started in 1876 and closed in 2012 due to the bad economical situation in the company. After its closure, the glasswork left behind contaminated soil with different concentrations of heavy metals such as, arsenic from arsenic trioxide, a chemical used to remove bubbles during the melting of glass, and lead oxide, a chemical used in the production of crystal glass. Crystal glass?s production occurred under 1921-1971, but emissions of lead into the air from Åfors glasswork continued until 2011, because of the artist Bertil Valliens? artglas was made in Åfors glasswork from 1970?s and onwards.The aim of this study was to estimate how much Lead (Pb) and arsenic (As) that were released by Åfors Glasswork into the atmosphere during the operational period of the glasswork in comparison with how much of lead and arsenic were purchased for the company. Added to the assistance of the data from National Archives the variations in the activities of Åfors glasswork could be shown.

Flödesoptimering på sjukhuslaboratorium: En praktisk implementering av lean

This study has investigated the possibilities of implementing lean in a division of a hospital in Stockholm. The goal was to reduce the lead time for the patient to get his diagnose by implementing lean in the two production flows of this division. In order to accomplish it, a complete map over the value stream has been done. With the help of the value stream map and lean theory a list over the processes in contradiction with lean has been made. Finally propositions to implement lean and by this way reduce the lead times in this stream have been made out.

Ledtidsreduktion i en kundorderstyrd produktion

AbstractPurpose ? The purpose of this study is to investigate possible reasons for long lead-time in a customer driven production, and how the lead-time can be reduced. To fulfil the purpose the study has been broken down into two questions.1. Whichfactorsaffectthelead-timeinacustomer-drivenproduction?2.

Behovet av blyhandskar som skydd mot sekundärstrålning vid röntgenundersökning av djur

X-rays are a potential risk for animal health care personnel. The present study will examine the risks for scattered radiation to the personnel, if no lead gloves are used when holding an animal during the x-ray examination. Furthermore, how the impact of the exposure values and body parts examined, affect the scattered dose to the hands of the holder. Also, the distance between the animal and the hand that holds it was evaluated to see the impact on scattered radiation exposure. Tested by a survey, to animal health care students, the frequency of the usage of lead gloves in Swedish animal hospitals was studied. According to the results from the analysis, animal health care personnel don't need to use lead gloves every time they hold an animal or a cassette during x-ray examinations.

Framtagning av beräkningsprogram för helsvetsade balk-balkinfästningar i stål : Verifiering genom fullskalig belastningsprovning

AbstractPurpose ? The purpose of this study is to investigate possible reasons for long lead-time in a customer driven production, and how the lead-time can be reduced. To fulfil the purpose the study has been broken down into two questions.1. Whichfactorsaffectthelead-timeinacustomer-drivenproduction?2.

Tungmetaller i metabolismen hos värphöns och slaktkycklingar

Mussel meal is a potential source of protein, with a good composition of amino acids, for laying hens and broiler chickens, and may replace the use of fish meal in organic poultry production. Lead and cadmium are heavy metals which occur in the environment and can be accumulated in mussels. When poultry are exposed to heavy metals, the metals are absorbed in the small intestine and distributed in the body in the form of ions, complexes or bound to proteins. In poultry, lead accumulates in bone tissue, liver and kidneys, while cadmium accumulates in liver and kidneys. Generally very low concentrations of these heavy metals occur in muscles of broilers which have been exposed to feed contaminated with cadmium or lead.

Till  framtida utvecklare

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Förutsättningar att utforma stationsbatterier i vattenkraftverk med Li-jonteknik

In hydropower plants it is necessary to always have local power supply. Therefore, the plants are equipped with batteries as stationary back up power. Vattenfall Vattenkraft is using lead acid batteries but has been investigating alternatives to replace them. The aim of this study is to investigate the potential of using Li-ion technology as back up power.The study showed that Li-ion batteries have many qualities. The Li-ion technology will decrease the space and maintenance demand.

Opera i Stockholm : Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

Opera i Stockholm, Stadsgårdskajen

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is calledWork process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result..

1 Nästa sida ->